Contact Us

Escape Fire Protection Ltd
Unit 8 - 30465 Progressive Way
Abbotsford, British Columbia
V2T 6W3

604-864-0376 Phone
604-864-0538 Fax
[email protected]

 

Service Division:

Trevor O'Brien – Service & Inspection Manager
[email protected]

 

Sprinkler Division:

Ezra Zapanta – President / Sr. Project Manager & Estimator
[email protected]

James Carrie – Project Manager / Estimator - Small Projects & Tenant Improvements 
[email protected]

Abid Khan – Project Manager / Estimator 

[email protected]

Ian Hecht – Field Superintendent
[email protected]

Catrina Huber – Administration & Office Manager 
[email protected]


 

 



 

Seylynn Village - Tower C

Featured Fire Protection Project

Seylynn Village - Tower C

Located in the Lower Lynn Valley, the first of a 3 tower development, this project includes 24 storeys, and 201 residential units.

General Contractor: ITC Construction   

Mechanical Contractor: Phase Mechanical

Click to Continue Reading This Fire Protection Case Study
{condition strAImage}
Binning Tower - UBC

Featured Fire Protection Project

Binning Tower - UBC

Located in UBC, this project includes 22 storeys, along with 3 levels of parkade, and a total of 217 residential units.

General Contractor: ITC Construction   

Mechanical Contractor: Phase Mechanical

Click to Continue Reading This Fire Protection Case Study
{endcondition}{condition strAImage}
Abbotsford Collegiate School

Featured Fire Protection Project

Abbotsford Collegiate School

Construction work began in late 2010 and was completed in 2013. The construction work included the replacement of some classrooms and shops, and a new administration area in a three-storey addition that is connected to the existing building. The Hub is a circular foyer with rolled sprinkler piping to match the interior radius.

General Contractor: Unitech Construction

Click to Continue Reading This Fire Protection Case Study
{endcondition}{condition strAImage}
Collingwood School

Featured Fire Protection Project

Collingwood School

Construction work began in 2012 and was completed in 2014. The construction work included upgrades to some classrooms and shops, as well as a major addition onto the building. The addition included a 2 level parkade, gymnasium, classrooms, and offices.

General Contractor: Heatherbrae Builders

Click to Continue Reading This Fire Protection Case Study
{endcondition}
Delta Rise

Featured Fire Protection Project

Delta Rise

Delta Rise will be the tallest tower in Delta upon completion. This project includes 38 storeys, and 317 residential units.

General Contractor: ITC Construction   

Mechanical Contractor: Phase Mechanical

Click to Continue Reading This Fire Protection Case Study
Previous Next