Featured Projects


Seylynn Village - Tower C

Seylynn Village - Tower C

Located in the Lower Lynn Valley, the first of a 3 tower development, this project includes 24 storeys, and 201 residential units.

General Contractor: ITC Construction   

Mechanical Contractor: Phase Mechanical

Click to Continue Reading This Fire Protection Case Study
Binning Tower - UBC

Binning Tower - UBC

Located in UBC, this project includes 22 storeys, along with 3 levels of parkade, and a total of 217 residential units.

General Contractor: ITC Construction   

Mechanical Contractor: Phase Mechanical

Click to Continue Reading This Fire Protection Case Study
Abbotsford Collegiate School

Abbotsford Collegiate School

Construction work began in late 2010 and was completed in 2013. The construction work included the replacement of some classrooms and shops, and a new administration area in a three-storey addition that is connected to the existing building. The Hub is a circular foyer with rolled sprinkler piping to match the interior radius.

General Contractor: Unitech Construction

Click to Continue Reading This Fire Protection Case Study
Collingwood School

Collingwood School

Construction work began in 2012 and was completed in 2014. The construction work included upgrades to some classrooms and shops, as well as a major addition onto the building. The addition included a 2 level parkade, gymnasium, classrooms, and offices.

General Contractor: Heatherbrae Builders

Click to Continue Reading This Fire Protection Case Study
Delta Rise

Delta Rise

Delta Rise will be the tallest tower in Delta upon completion. This project includes 38 storeys, and 317 residential units.

General Contractor: ITC Construction   

Mechanical Contractor: Phase Mechanical

Click to Continue Reading This Fire Protection Case Study