Fire Protection

Sprinkler Installations

 Fire Protection Systems Installation

 We offer complete design, engineering, installation and obtaining municipal permits for the following types of fire suppression systems:

  •  Water based Sprinkler System.
    • Dry Systems
    • Wet Systems
    • Pre-action & Deluge Systems
    • Fire Pumps
    • Antifreeze Systems
  • Clean Agent Suppression Systems (Novec 1230)

We are experienced with the entire process of installing sprinkler systems from initial budgetary reviews, design, engineering, municipal permit submission to installation and final inspections. We have installed hundreds systems in all types of buildings. We are familiar with tenant improvements, renovations, additions and construction. Please review our current and completed projects links located to the right of this page. 

Certified Installers

Our sprinkler system installers carry a red seal certificate of qualification  issued by the Industry Training Authority or are registered apprentices working towards becoming certified. We employ factory trained technicians to install our Kidde wet and dry chemical and Ansul Sapphire & Foam systems.

 Contact our estimating department for a free quotation. 604-864-0376

 

Our Projects

Escape Fire Protection works with companies through-out the Lower Mainland and Western Canada. View featured projects for details on a few of our more notable projects.

List of our Current and Completed Projects:

Seylynn Village - Tower C

Featured Fire Protection Project

Seylynn Village - Tower C

Located in the Lower Lynn Valley, the first of a 3 tower development, this project includes 24 storeys, and 201 residential units.

General Contractor: ITC Construction   

Mechanical Contractor: Phase Mechanical

Click to Continue Reading This Fire Protection Case Study
{condition strAImage}
Binning Tower - UBC

Featured Fire Protection Project

Binning Tower - UBC

Located in UBC, this project includes 22 storeys, along with 3 levels of parkade, and a total of 217 residential units.

General Contractor: ITC Construction   

Mechanical Contractor: Phase Mechanical

Click to Continue Reading This Fire Protection Case Study
{endcondition}{condition strAImage}
Abbotsford Collegiate School

Featured Fire Protection Project

Abbotsford Collegiate School

Construction work began in late 2010 and was completed in 2013. The construction work included the replacement of some classrooms and shops, and a new administration area in a three-storey addition that is connected to the existing building. The Hub is a circular foyer with rolled sprinkler piping to match the interior radius.

General Contractor: Unitech Construction

Click to Continue Reading This Fire Protection Case Study
{endcondition}{condition strAImage}
Collingwood School

Featured Fire Protection Project

Collingwood School

Construction work began in 2012 and was completed in 2014. The construction work included upgrades to some classrooms and shops, as well as a major addition onto the building. The addition included a 2 level parkade, gymnasium, classrooms, and offices.

General Contractor: Heatherbrae Builders

Click to Continue Reading This Fire Protection Case Study
{endcondition}
Delta Rise

Featured Fire Protection Project

Delta Rise

Delta Rise will be the tallest tower in Delta upon completion. This project includes 38 storeys, and 317 residential units.

General Contractor: ITC Construction   

Mechanical Contractor: Phase Mechanical

Click to Continue Reading This Fire Protection Case Study
Previous Next