Mixed-use & Residential

Installations

Current and past projects by Escape Fire Protection:

Seylynn Village - Building A - North Vancouver - 30 Storey Residential condominium tower on 2 levels of parkade. ITC Construction

VCLTF: Affordable Rental Project - Site 4/5 Tower & Townhomes - Vancouver - 2x12 Storey residential tower with additional townhome portion - UPA Construction Group

Hyde Canyon - Langley - Sprinkler protection of 32 single family homes - District Homes

Creekside Mills Phase 1 - Sprinkler protection of 44 single family homes -  Frosst Creek Developments Ltd.

Richmond Storey's Project - Richmond - 16 Storey affordable housing development. Vanmar Constructors Inc.

Ash St. Apartments - New Westminster - 4 Storey woodframe development. - Converge Construction

VPL/YWCA - Vancouver -  6 Storey Library and Mixed Use building. - Haebler Construction

1555 West Eigth Ave. - Vancouver - 8 Storey residential building. - Urban One Builders

Delta Rise - Delta -  38 Storey Residential condominium tower on 2 levels of parkade. ITC Construction

Binning Tower at Wesbrook - UBC -  26 Storey Residential condominium tower on 3 levels of parkade. ITC Construction

Seylynn Village - Building D - North Vancouver - 6 Storey Residential and amenity building on 2 levels of parkade. ITC Construction

Seylynn Village - Building C - North Vancouver - 24 Storey Residential condominium tower on 2 levels of parkade. ITC Construction

Omega Condominiums - Richmond - 245 Units, 2 Wood frame condominium buildings on a common parkade. Concord Pacific Developments

Eight West Condominiums - New Westminster – 153 Units, 2 Wood frame condominium buildings on a common parkade. Peak Construction.

The Village at Bedford Landing - Fort Langley – 2 Wood frame condominium buildings on a common parkade. Parklane Homes

Gilker Hill Townhomes - Maple Ridge – 51 Townhomes.  Bluetree-Gilker Homes

Mackin Park - Coquitlam – 2 Wood frame condominium buildings on a common 4 level parkade with 1 level of commercial. Bluetree Homes

Latitude Condominiums - Surrey – 4 Story condominium building with parkade. TPC 2000 Construction.

Amadeo - New Westminster - 10 storey tower w/ mixed use commercial and parkade. Fire pump. Mierau Construction

The Crossings - Abbotsford - 3 Buildings of 4 storey low-rise condominiums/ multi-use/ retail/ underground parkade. Palcor Construction

Bedford Landing - Fort Langley- 4 storey low-rise 122 unit residence with 8 unit townhomes and underground parkade. Parklane Waterfront Homes

New Mark - Chilliwack - 3 Buildings of 4 storey low-rise condominiums and underground parkade. Reddale Construction

Latitude - Abbotsford - Construction of 147 condominiums  with U/G parkade. CWL Construction

Sunpeaks Delta Residences - Sunpeaks,BC - New, Hotel / condominium project. 64 Units, two levels of retail and three levels of U/G parking. ForeSite Construction    

Seylynn Village - Tower C

Featured Fire Protection Project

Seylynn Village - Tower C

Located in the Lower Lynn Valley, the first of a 3 tower development, this project includes 24 storeys, and 201 residential units.

General Contractor: ITC Construction   

Mechanical Contractor: Phase Mechanical

Click to Continue Reading This Fire Protection Case Study
{condition strAImage}
Binning Tower - UBC

Featured Fire Protection Project

Binning Tower - UBC

Located in UBC, this project includes 22 storeys, along with 3 levels of parkade, and a total of 217 residential units.

General Contractor: ITC Construction   

Mechanical Contractor: Phase Mechanical

Click to Continue Reading This Fire Protection Case Study
{endcondition}{condition strAImage}
Abbotsford Collegiate School

Featured Fire Protection Project

Abbotsford Collegiate School

Construction work began in late 2010 and was completed in 2013. The construction work included the replacement of some classrooms and shops, and a new administration area in a three-storey addition that is connected to the existing building. The Hub is a circular foyer with rolled sprinkler piping to match the interior radius.

General Contractor: Unitech Construction

Click to Continue Reading This Fire Protection Case Study
{endcondition}{condition strAImage}
Collingwood School

Featured Fire Protection Project

Collingwood School

Construction work began in 2012 and was completed in 2014. The construction work included upgrades to some classrooms and shops, as well as a major addition onto the building. The addition included a 2 level parkade, gymnasium, classrooms, and offices.

General Contractor: Heatherbrae Builders

Click to Continue Reading This Fire Protection Case Study
{endcondition}
Delta Rise

Featured Fire Protection Project

Delta Rise

Delta Rise will be the tallest tower in Delta upon completion. This project includes 38 storeys, and 317 residential units.

General Contractor: ITC Construction   

Mechanical Contractor: Phase Mechanical

Click to Continue Reading This Fire Protection Case Study
Previous Next