Service Division

Inspection & Testing

Fire Equipment Service & Inspections

24 Emergency Service - 604-864-0376

We offer service, inspection and preventative maintenance for all types of building life safety equipment and systems. Our technicians are ASTTBC certified and current with municipal and provincial regulations and adopted codes.  

Our goal is to make the inspection process as easy as possible for our clients. Once we conduct the first inspection a building, the information is added in to our data base so that we can keep a record of inspections, maintenance work preformed and advise of any scheduling requirements for future inspections. Inspection reports and deficiency lists are emailed after inspections have been completed.

Services we offer:  

  • Fire Sprinkler Systems
    • Conduct annual, semi-annual, quarterly and monthly inspections, to NFPA 25 standards.
    • Dry System winterizations.
    • Standpipe systems and fire hose inspection and testing.
  • Fire Extinguishers
    • Sales - we stock a large inventory of fire extinguishers, brackets and cabinets.
    • Service and maintenance.
  • Fire Alarm System Testing to ULC standards.
  • Fire Alarm panel replacements.
  • Emergency Lighting inspection, testing and repairs.
  • Exit Sign inspections and repairs.
  • Back Flow Testing and Service
  • Fire Hydrant inspections and service.
  • Fire Hydrant flow test to obtain static and residual pressures.
  • Kitchen Suppression System - Wet Chemical - semi-annual testing and inspections.
  • Paint Spray Booth - Dry Chemical - semi-annual testing and inspections.

We provide inspections & documentation as required by the B.C. Fire Code.

Call our Service Department at 604-864-0376 or visit our contact page.

 

 

Call or email to schedule a free quotation!

service@escapefireprotection.com

604-864-0376

Seylynn Village - Tower C

Featured Fire Protection Project

Seylynn Village - Tower C

Located in the Lower Lynn Valley, the first of a 3 tower development, this project includes 24 storeys, and 201 residential units.

General Contractor: ITC Construction   

Mechanical Contractor: Phase Mechanical

Click to Continue Reading This Fire Protection Case Study
{condition strAImage}
Binning Tower - UBC

Featured Fire Protection Project

Binning Tower - UBC

Located in UBC, this project includes 22 storeys, along with 3 levels of parkade, and a total of 217 residential units.

General Contractor: ITC Construction   

Mechanical Contractor: Phase Mechanical

Click to Continue Reading This Fire Protection Case Study
{endcondition}{condition strAImage}
Abbotsford Collegiate School

Featured Fire Protection Project

Abbotsford Collegiate School

Construction work began in late 2010 and was completed in 2013. The construction work included the replacement of some classrooms and shops, and a new administration area in a three-storey addition that is connected to the existing building. The Hub is a circular foyer with rolled sprinkler piping to match the interior radius.

General Contractor: Unitech Construction

Click to Continue Reading This Fire Protection Case Study
{endcondition}{condition strAImage}
Collingwood School

Featured Fire Protection Project

Collingwood School

Construction work began in 2012 and was completed in 2014. The construction work included upgrades to some classrooms and shops, as well as a major addition onto the building. The addition included a 2 level parkade, gymnasium, classrooms, and offices.

General Contractor: Heatherbrae Builders

Click to Continue Reading This Fire Protection Case Study
{endcondition}
Delta Rise

Featured Fire Protection Project

Delta Rise

Delta Rise will be the tallest tower in Delta upon completion. This project includes 38 storeys, and 317 residential units.

General Contractor: ITC Construction   

Mechanical Contractor: Phase Mechanical

Click to Continue Reading This Fire Protection Case Study
Previous Next